A church rebrand can be a lot like cleaning the house: You know you need to do it, but it always takes longer than you thought.
There’s not an exact number of weeks or months, but I’ve noticed some patterns that can give you a ballpark idea for how long a church rebrand takes.
Here’s the formula:
12 Months or Hard Deadline / Designer Availability (1-4) + 1 week per committee member
This formula is part of why I encourage pastors to set a hard deadline for the launch. Without one, it’s easy to keep making minor tweaks for months, with diminishing returns.
Many churches I've worked with have chosen to announce the rebrand at an annual gathering or upcoming church event.
This gives you less flexibility, but it’s a great way to keep your eyes on the prize and push through sticking points.
The larger the group, the harder it becomes to schedule meetings, commit to colors, and review designs. Decision paralysis is a documented phenomenon that is amplified by more inputs.
Only adding 1 week per committee member may not be enough, but it’s close.
Using an in-house designer is going to be the most flexible and fastest way to rebrand, hands down.
With a larger agency, you may be one of dozens of clients and might not get the fastest turnaround.
I personally only take on a couple of new clients per month so I can focus my attention on the project at hand, keeping it on track.
Smaller churches may not have much in the way of merch, letterhead, or building signage. They may or may not have a website. In the design world, we lump all these items into a category we call "brand collateral" or "collateral" for short.
For larger churches, the transition may take longer because they have more collateral to update. Building signs can take weeks to get printed or manufactured, the website needs to be redesigned, and merch probably needs to be created.